DRAXIS as external contractor to the project was responsible for the installation study of physicochemical telemetry monitoring station in the western coastal zone of Thermaikos gulf, which included:
- a feasibility study and action for the supply & installation of telemetric stations;
- a site selection for the installation of telemetry stations and alternative scenarios;
- an installation study;
- specifications of the multicriteria selection tool regarding the installation positions