/
As subcontractor to the project, DRAXIS was responsible for the implementation of two environmental impact assessment studies. More specific DRAXIS conducted one study for selected multimodal corridors in the region of the Thessaloniki port and analysis of environmental constraints that prevent the growth of the port of Thessaloniki. Additionally, a second study on the same thematic followed for the region of Patra and Patra’s port.
The studies were conducted within the framework of the project «Improving Productive Clusters Accessibility to Global Market – BACKGROUNDS funded by the MED Program.